India · coal at power plants · CEA daily report
31 of 187 coal plants are running critically low on stock · as on 2026-08-17
Each thermal station's coal stock as a share of its normative requirement. Below 100% means less than the mandated buffer; the plants below are the most exposed to a supply slip.
- Nagai TPP IPP — d
- TORANGALLU TPS(SBU-I) IPP 0.0 d
- OPG Power Generation Private Limited IPP 4.6 d
- TUTICORIN TPP ST-IV IPP 0.9 d
- SASAN UMTPP IPP 0.8 d
- DAMODARAM SANJEEVAIAH TPS Andhra Pradesh 1.4 d
- ADANI POWER LIMITED UDUPI TPP IPP 2.0 d
- TORANGALLU TPS(SBU-II) IPP 2.0 d
- TUTICORIN (P) TPP IPP 10.0 d
- NIWARI TPP IPP 2.5 d
- ADANI POWER LIMITED MUNDRA TPP - III IPP 2.7 d
- SIMHAPURI TPS IPP 2.9 d
- YADADRI TPS Telangana 2.8 d
- ADANI POWER LIMITED KAWAI TPP IPP 9.3 d
- BUTIBORI TPP IPP 2.8 d
- AMRAVATI TPS IPP 3.4 d
- RAYALASEEMA TPS Andhra Pradesh 3.6 d
- VIZAG TPP IPP 3.5 d
- ADANI POWER LIMITED MUNDRA TPP - I & II IPP 3.9 d
- ADANI POWER LIMITED TIRODA TPP IPP 3.7 d
Bar = actual stock vs the plant's normative requirement · “d” = days of coal left at current burn.
Which plants are running hardest — and idlest
Plant load factor (PLF) — output as a share of capacity — measures utilisation, not fuel risk. A well-stocked plant can still sit idle if it isn't dispatched; capacity size ranks equally idle plants.
- Vedanta Ltd Chhattisgarh TPP IPP · 600 MW 0 % PLF
- AMARKANTAK EXT TPS Madhya Pradesh · 210 MW 0 % PLF
- Nagai TPP IPP · 150 MW 0 % PLF
- SEIONI TPP NTPC JV · 600 MW 7 % PLF
- TUTICORIN TPP ST-IV IPP · 525 MW 11 % PLF
- SIKKA REP. TPS Gujarat · 500 MW 11 % PLF
- BANDEL TPS West Bengal · 270 MW 14 % PLF
- YERMARUS TPP Karnataka · 1,600 MW 30 % PLF
- TORANGALLU TPS(SBU-II) IPP · 600 MW 31 % PLF
- NORTH CHENNAI TPS STAGE 3 Tamil Nadu · 800 MW 34 % PLF
- OBRA TPS Uttar Pradesh · 2,320 MW 35 % PLF
- SIMHAPURI TPS IPP · 600 MW 35 % PLF
Bar width = installed capacity, for scale.